Transform distressed properties into beautiful, functional homes. Complete renovation services from foundation to finish with professional project management throughout Alabama.
Every aspect of property rehabilitation handled by experienced professionals with attention to detail and quality.
Foundation work, framing, roofing, and major structural improvements
Complete electrical rewiring, plumbing updates, and system installations
Flooring, painting, cabinets, countertops, and interior design elements
Siding, windows, doors, landscaping, and curb appeal enhancements
Heating, cooling, and insulation systems for energy efficiency
Full permit acquisition and inspection coordination throughout the project
From modest renovations to complete transformations, we handle projects of all sizes and budgets.
Complete transformation of existing homes including all systems and finishes
Careful restoration of historic properties maintaining original character
Room additions, second stories, and home expansion projects
Every project pulls required permits, passes inspection, and is tracked daily in your client portal. You'll know what's happening at every phase.
1-2 weeks
Comprehensive property evaluation, permits, and detailed project planning
3-6 weeks
Foundation, framing, roofing, electrical, and plumbing work
4-8 weeks
Drywall, flooring, kitchen, bathrooms, and interior completion
2-4 weeks
Exterior work, landscaping, final inspections, and project completion
We don't ask you to take our word for it. Every claim on this site is either a license you can verify with the State of Alabama or a permit that's part of public record.
Every license below can be confirmed against the public record.
EPA Lead-Safe Certified
Required for pre-1978 homes under the federal RRP Rule.
About EPA Lead-Safe (RRP)Insured & Bonded
General liability + workers’ comp. COI available on request.
1-Year Workmanship Warranty
On top of manufacturer material warranties. Itemized in every contract.
100/100 BuildZoom scoreCommon questions about whole-property renovations in Birmingham, Hoover, Vestavia Hills, and across Alabama. Have a project-specific question? Call 205-281-0940 and we'll answer it for your specific property.
For a standard single-family home in Birmingham, Hoover, or Vestavia Hills, our four-phase process — assessment, structural/systems, interior finishing, and exterior/final — runs roughly 10–20 weeks depending on square footage and scope. Distressed or foreclosure properties often sit at the longer end because deferred maintenance compounds: we scope every system (electrical, plumbing, HVAC, foundation) during Phase 1 and build realistic buffers into the schedule before any work begins. Call 205-281-0940 for a site-specific estimate.
We hold Alabama General Contractor License #S-58482 and Alabama Home Builder License HBLB #24914, so we serve as the single GC coordinating all licensed trade work — structural, electrical, plumbing, HVAC, finish carpentry, and exterior. You have one point of contact, one contract, and one schedule instead of juggling five separate subs. This matters for Jefferson County permit purposes as well, because inspections are sequenced through a single permit file rather than piecemeal trade permits.
Each municipality in Jefferson County runs its own permit and inspection process: Birmingham uses the City of Birmingham Building Department, Hoover and Vestavia Hills each have separate inspection offices with their own plan-review timelines. We pull all required permits before breaking ground and schedule required rough-in and final inspections at each phase. Unpermitted work creates title problems on resale and triggers costly re-inspection demands from FHA and VA appraisers — we don't skip this step regardless of timeline pressure.
For larger whole-house projects we structure progress-based draws tied to phase completions: typically Phase 1 completion, rough-in inspections passed, drywall done, and final walkthrough. Every change order — any scope addition or deletion — is documented in writing through the client portal before work proceeds. There are no 'we agreed on the phone' situations; the portal log is the record of what was agreed, when, and at what cost. This protects both sides and keeps the project budget traceable.
For partial renovations (a single bathroom or a kitchen swap-out) it is sometimes possible to remain in the home with appropriate staging. For a true full rehab — structural work, electrical rewire, full kitchen and bath gut — we strongly advise vacating for the majority of the project. Dust, noise, utility outages during rough-in, and Jefferson County inspection hold periods make the space difficult and sometimes unsafe to occupy. We will tell you honestly during the Phase 1 scope review which category your project falls into.
Kitchen scope typically includes cabinet replacement or refacing, countertops, sink and faucet, tile backsplash, appliance rough-ins, lighting, and painting. Full bath scope covers shower/tub surround tile, vanity, toilet, flooring, exhaust fan, and all finish trim. All completed work is backed by our 1-year workmanship warranty; materials carry manufacturer warranties that pass through to you. For distressed or foreclosure properties across Alabama where deferred maintenance runs deep, we document the pre-rehab condition with photos so the warranty baseline is clear.
Free takeoff math from the same deterministic engine behind our instant estimates.
Shingle bundles needed for a roof area, waste included.
From initial assessment to final walkthrough, we handle every detail of your property rehabilitation. Get a comprehensive project quote today.